NEC3: using and amending the Engineering and Construction Contract | Practical Law

NEC3: using and amending the Engineering and Construction Contract | Practical Law

A note on using and amending the NEC3 Engineering and Construction Contract (ECC).

NEC3: using and amending the Engineering and Construction Contract

Practical Law UK Practice Note 4-500-3162 (Approx. 19 pages)

NEC3: using and amending the Engineering and Construction Contract

by John Hughes-D'Aeth, Bryan Cave Leighton Paisner
Law stated as at 10 Aug 2020England, International, Wales
A note on using and amending the NEC3 Engineering and Construction Contract (ECC).
The NEC4 suite of contracts was published on 22 June 2017, replacing the NEC3 suite of contracts. This note is no longer maintained.