A note on the changes to the Scheme for Construction Contracts (England and Wales) Regulations 1998 (SI 1998/649) (Scheme for Construction Contracts 1998), as a result of Part 8 of the Local Democracy, Economic Development and Construction Act 2009 (LDEDC Act 2009). These include changes to adjudication costs, a statutory slip rule and payment notices. In addition, the note:

Scheme for Construction Contracts 1998: What changes does the LDEDC Act 2009 require?

Practical Law UK Practice Note 6-501-8964 (Approx. 13 pages)

Scheme for Construction Contracts 1998: What changes does the LDEDC Act 2009 require?

by PLC Construction
Law stated as at 01 Oct 2011England, Scotland, Wales
A note on the changes to the Scheme for Construction Contracts (England and Wales) Regulations 1998 (SI 1998/649) (Scheme for Construction Contracts 1998), as a result of Part 8 of the Local Democracy, Economic Development and Construction Act 2009 (LDEDC Act 2009). These include changes to adjudication costs, a statutory slip rule and payment notices. In addition, the note: