Pre-Lien Notice of Mechanics Lien to Owner (Subcontractor's 60-Day Notice) (IL) | Practical Law

Pre-Lien Notice of Mechanics Lien to Owner (Subcontractor's 60-Day Notice) (IL) | Practical Law

A pre-lien notice from a subcontractor to an owner of an owner-occupied single-family residence as required under the Illinois Mechanics Lien Act. This pre-lien notice must be provided by a subcontractor to the owner within 60 days of starting construction work at the residence. This Standard Document has integrated notes with important explanatory and drafting tips.

Pre-Lien Notice of Mechanics Lien to Owner (Subcontractor's 60-Day Notice) (IL)

Practical Law Standard Document w-000-1004 (Approx. 12 pages)

Pre-Lien Notice of Mechanics Lien to Owner (Subcontractor's 60-Day Notice) (IL)

by Practical Law Real Estate
MaintainedIllinois
A pre-lien notice from a subcontractor to an owner of an owner-occupied single-family residence as required under the Illinois Mechanics Lien Act. This pre-lien notice must be provided by a subcontractor to the owner within 60 days of starting construction work at the residence. This Standard Document has integrated notes with important explanatory and drafting tips.